Typhoon-Proof Lantern Strategy: Prevention & Restoration

Client: Hong Kong Cultural Organization
Event: Major Traditional Festival Display
Crisis: Super Typhoon Threat
Strategy:

1.Pre-storm removable component evacuation

2.Post-damage structural restoration

Result: Zero component loss · Full installation recovery

typhoon-damage-context
Aldrich Bay Park after typhoon impact - showing fallen trees and flooded grounds

When super typhoon warnings were issued for Hong Kong in late 2023, our team implemented a proven two-stage protection strategy for Aldrich Bay Park's cultural lantern exhibition. A 6-meter traditional vessel lantern - with its delicate silk sails and wooden textures - faced dual threats from 150km/h winds and flood risk.

Stage 1: Pre-Storm Component Evacuation

Executed 36 hours before landfall

Critical Actions:

Priority Disassembly: Safely removed all detachable artistic components

Secure Transport: Climate-controlled vehicles moved elements to dry storage

Infrastructure Reinforcement: Strengthened fixed structural frames

pre-storm-component-removal
Removing detachable artistic elements before storm impact

safe-component-transport
Transporting delicate cultural components to safety

"Our modular design allows removing 85% of artistic elements in under 8 hours. What remains are reinforced steel frames designed to withstand extreme conditions." -Chief Production Engineer

Stage 2: Post-Damage Restoration

Commencing immediately after storm passage

Damage Assessment:

● Structural integrity evaluation of fixed frames

● Electrical system diagnostics

● Site safety clearance

post-storm-structural-damage
Fixed structural frame after typhoon impact

Restoration Protocol:

1.Frame Rehabilitation: Steel reinforcement and alignment correction

2.System Renewal: Waterproof rewiring and LED replacement

3.Artistic Reintegration: Reattaching preserved components

Why This Dual-Phase System Works

For Venue Operators:

Prevention Saves Costs: Removing components reduces repair costs by 70%

Specialized Infrastructure: Reinforced frames withstand Category 5 winds

Rapid Recovery: Average 48-hour restoration timeline

For Cultural Preservation:

● 100% artistic element preservation

● Historical craftsmanship protection

● Continuity of cultural expression

restored-artistic-integration
Reattached artistic components on restored structure

recovered-cultural-lantern
Fully reintegrated cultural lantern display

Implement This Protection System

For Upcoming Events:

Preventive Planning Package: Site-specific component removal protocol

Storm-Ready Infrastructure: Wind-optimized structural engineering

Emergency Response Agreement: 24/7 restoration guarantee

Contact our risk management team to develop your lantern protection strategy